The Robotics Institute
Search the site
RI | Publications | An Integrated Framework for Generating and Revising Factory Schedules

Text only version of this site

An Integrated Framework for Generating and Revising Factory Schedules
S. Smith, P.S. Ow, N. Muscettola, J.Y. Potvin, and D. Matthys
Journal of the Operational Research Society, Vol. 41, No. 6, June, 1990.

Jump to: Notes | Text Reference | BibTeX Reference

Notes

Associated center: CIMDS
Associated lab/group: Intelligent Coordination and Logistics Laboratory

Note: reprinted in Artificial Intelligence in Operational Research, (eds. G.I. Doukidis and R.J. Paul), Macmillan Press, 1992

Text Reference

S. Smith, P.S. Ow, N. Muscettola, J.Y. Potvin, and D. Matthys, "An Integrated Framework for Generating and Revising Factory Schedules," Journal of the Operational Research Society, Vol. 41, No. 6, June, 1990.

BibTeX Reference

@article{Smith_1990_699,
   author = "Stephen Smith and P.S. Ow and Nicola Muscettola and J.Y. Potvin and D. Matthys",
   title = "An Integrated Framework for Generating and Revising Factory Schedules",
   journal = "Journal of the Operational Research Society",
   month = "June",
   year = "1990",
   volume = "41",
   number = "6",
   note = "reprinted in Artificial Intelligence in Operational Research, (eds. G.I. Doukidis and R.J. Paul), Macmillan Press, 1992"
}


The Robotics Institute is part of the School of Computer Science, Carnegie Mellon University.
For updates and comments, please see these instructions.
This page maintained by robotwebmaster@ri.cmu.edu