Search
Navigator: RI | People | Dag Kjenstad
Graphics enhanced version of this site
Dag Kjenstad
Visiting Research Scholar
No longer a member of RI.
Jump to:
Labs & Groups |
Projects |
Publications
Past Labs & Groups
Past Projects
-
Integrated Process Planning/Production Scheduling - A blackboard-based agent architecture for supporting
mixed-initiative decision-making and integration functionalities.
-
Micro-Opportunistic Scheduling - Work involving Micro-Boss: a dynamic finite capacity scheduling tool for supporting efficient just-in-time operation in complex manufacturing environments subject to rapidly changing conditions.
Publications
Note: This list may not be comprehensive. It contains only those publications in the RI publications database. Entries are listed in reverse chronological order.
- Agent-based e-Supply Chain Decision Support
N. Sadeh-Koniecpol, D. Hildum, and D. Kjenstad
Journal of Organizational Computing and Electronic Commerce, Vol. 13, No. 3, March, 2003.
[Abstract]
Download: pdf [357 KB] copyrighted
- MASCOT: An Agent-Based Architecture for Coordinated Mixed-Initiative Supply Chain Planning and Scheduling
N. Sadeh-Koniecpol, D. Hildum, D. Kjenstad, and A. Tseng
Workshop notes, Agent-Based Decision Support for Managing the Internet-Enabled Supply Chain, Third International Conference on Autonomous Agents (Agents '99), May, 1999.
Download: pdf [102 KB], ps.gz [422 KB] copyrighted
- A Blackboard Architecture for Integrating Process Planning and Production Scheduling
N. Sadeh-Koniecpol, D. Hildum, D. Kjenstad, A. Tseng, T.J. Laliberty, and J. McA'Nulty
Concurrent Engineering: Research & Applications, Vol. 6, No. 2, June, 1998.
Download: pdf [110 KB], ps.gz [233 KB] copyrighted
- Blackboard Agents for Mixed-Initiative Management of Integrated Process-Planning/Production-Scheduling Solutions Across the Supply Chain
D. Hildum, N. Sadeh-Koniecpol, T.J. Laliberty, J. McA'Nulty, S. Smith, and D. Kjenstad
Proceedings of the Ninth Conference on Innovative Applications of Artificial Intelligence (IAAI-97), July, 1997.
Download: pdf [73 KB], ps.gz [197 KB] copyrighted
- A Blackboard Architecture for Integrated Process Planning and Production Scheduling
T.J. Laliberty, D. Hildum, N. Sadeh-Koniecpol, J. McA'Nulty, D. Kjenstad, and S. Smith
Proceedings ASME Design for Manufacturing Conference, August, 1996.
Download: pdf [32 KB], ps.gz [26 KB] copyrighted
- Mixed-Initiative Management of Integrated Process-Planning and Production-Scheduling Solutions
D. Hildum, N. Sadeh-Koniecpol, T.J. Laliberty, S. Smith, J. McA'Nulty, and D. Kjenstad
Proceedings NSF Research Planning Workshop on Artificial Intelligence and Manufacturing, June, 1996.
Download: pdf [99 KB], ps.gz [209 KB] copyrighted
- An Integrated Process-Planning/Production-Scheduling Shell for Agile Manufacturing
N. Sadeh-Koniecpol, D. Hildum, T.J. Laliberty, S. Smith, J. McA'Nulty, and D. Kjenstad
tech. report CMU-RI-TR-96-10, Robotics Institute, Carnegie Mellon University, May, 1996.
[Abstract]
Download: pdf [107 KB], ps.gz [212 KB] copyrighted
The Robotics Institute is part of the
School of Computer Science,
Carnegie Mellon University.
For updates and comments, please see these
instructions.
This page maintained by robotwebmaster@ri.cmu.edu